Skip to content
BOUATConstruction

Section 02.0136°43'N 3°00'E — Design & Engineering

Calculation before concrete.

A multidisciplinary team that designs, sizes and verifies the structure before the first shovel hits the ground.

Services
6
Regulations
RPA · CBA · DTR
Deliverables
Drawings + notes
Follow-up
Weekly

Section B36°43'N 3°00'E — Process

How an assignment unfolds.

  1. Step 01

    Feasibility study

    Site analysis, regulatory constraints and target budget.

  2. Step 02

    Design & sizing

    Structural choices, calculation notes and validation of assumptions.

  3. Step 03

    Construction drawings

    Formwork, rebar and network drawings ready for site.

  4. Step 04

    Construction

    Team mobilisation, execution and continuous quality control.

  5. Step 05

    Handover & follow-up

    Snag clearance, as-built documentation and ongoing support.

See projects from this department

Section 0736°43'N 3°00'E — Contact

A project to study or to build?

Professionalism and expertise at the service of the construction trades.